“In 2016, when we started Build, Build, Build, critics said that the EDSA Decongestion Program is mathematically impossible, that it could not be done, that President Rodrigo Duterte was overpromising, and that Google Maps did not support such assertion. They failed to see the bigger picture — the possibility of a 90-year-old EDSA back to its original 1930s form, a future where Filipinos do not have to debate about Metro Manila’s “true midpoint” and a reality wherein every city in Metro Manila can be accessed within a 20 to 30 minute time frame” FilipinoBuild Build BuildEdsaMetro Manila Author:Anna Mae Yu Lamentillo , Night Owl: A Nationbuilder’s Manual
“Back in 2016, no one knew what Build, Build, Build meant or what it stood for. Critics had very little expectation of the team. They wagered against our success, not knowing that when they did, they gambled against the future of their country. They were certain that the infrastructure projects would never materialize — that blueprints would remain as drawings. They didn’t expect 6.5 million Filipinos to stand and work behind it.” InfrastructureFilipinoBuild Build Build Author:Anna Mae Yu Lamentillo , Night Owl: A Nationbuilder’s Manual